| Customer/Owner |
Name |
Boiler make |
Year |
Burner make/Fuel type |
| Tanker Pacific |
Montara Venture |
Mac 30B |
2007 |
Full re-tubing and refurbishment of two ER boilers |
| SBM - Monaco |
Esprito Sanro FPSO |
Hitachi |
2007 |
Full re-tubing and refurbishment of two ER boilers. Superheater upgrade etc. |
| SBM - Gusto |
Capixaba FPSO |
Foster Wheeler 60 t/h |
2005 |
Full re-tubing and refurbishment of two ER boilers. Superheater upgrade etc. |
| SBM - Monaco |
Espadarte FPSO |
Combustion Engineering; CE V2M9 |
2003 |
Replacement of furnace, screen tubes, generating tubes and de-superheater |
| SBM - Monaco |
FPSO Rang Dong 1 |
Kawasaki UFG 75/51 |
2003 |
Complete retubing of port and partial re-tubing of stbd. boilers |
| Petrobras |
FPSO Vidal de Negreiros P-31 |
IHI MDM 901 |
2003 |
Reneweal of superheater headers and superheater tubes, 2 x main boilers |
| MODEC-Houston/EXXON |
FSO Krome Kribi 1 |
CE V2M8 |
2002 |
Complete re-tubing of 2 x main boilers |
| SBM - Monaco |
FPSO Marlim Sul |
Foster Wheeler DSD |
2002 |
Complete re-tubing of 2 x main boilers |
| Petrobras |
FPSO Cairù; P-32 |
IHI MDM-901 |
2002 |
Annual service and maintenance Contract for 3 main boilers |
| Petrobras |
FPSO Henrique Dias; P-33 |
IHI MDM-901 |
2002 |
Annual service and maintenance Contract for 3 main boilers |
| SBM - Monaco |
FPSO Jamestown |
Babcock Integral |
2001 |
Complete retubing of stbd. boiler and re-tubing of port boiler furnace tubes |
| Osprey Maritime (Asia) Thome Ship Management |
T/T Kartika Ayu |
Babcock Integral |
2001 |
Re-tubing of superheater, furnace floor and generating tubes - port and stbd. boilers |
| Northern Marine Mgmt Ltd, UK |
T/T Stena King |
Foster Wheeler; IHI/MDM |
2001 |
Renewal of superheaters - port boiler |
| Northern Marine Mgmt Ltd, UK |
T/T Stena Queen |
Foster Wheeler; IHI/MDM |
2001 |
Renewal of superheaters - port boiler |
| Northern Marine Mgmt Ltd, UK |
T/T Stena Conductor |
Foster Wheeler; IHI/MDM |
2001 |
Renewal of superheater and screen tubes |
| Northern Marine Mgmt Ltd, UK |
T/T Stena Congress |
Foster Wheeler; IHI/MDM |
2001 |
Fabricate superheater tubes and installation |
| Thome Ship Management (Osprey Maritime) - Singapore |
T/TT Kartika Ayu |
Babcock Integral |
2000 |
Supply and re-tubing of superheater - port main boiler |
| Polembros Shipping |
Good Hope |
Aalborg AT-4 Dual Evaporation |
2000 |
Re-tubing of primary and secondary stbd. boiler |
| Andros Maritime |
Crete |
CE V2M8 |
2000 |
Repair of roof/side wall tubes |
| Woodside Energy |
Cossack Pioneer |
CE V2M8 |
1999 |
Re-tubing of superheater and replacing the superheater headers |